Dog Tracking Leash Long Leads Non-Slip Nylon Training Walking 3m 5m 10m 15m For Medium Large Dogs Soft Padded Handle ali-66275275

  • £95.63£17.37
  • Product Code:66275275
  • Availability:In Stock

  • Brand Name: Beirui
  • Material: Nylon
  • Season: All Seasons
  • Feature: Padded
  • Type: Leashes
  • Dog Leash Type: Basic Leashes
  • Type: Dogs
  • Pattern: Braided
  • Remaining Shelf Life: >6 months
  • Applicable Dog Breed: Large Medium-sized Dog
  • Model Number: BJL03
  • Dog Tracking Leash Long Leads Non-Slip Nylon Training Walking 3m 5m 10m 15m For Medium Large Dogs Soft Padded Handle ali-66275275

    Write a review

    Please login or register to review